Modified Initial Study/addendum for the Proposed Project Enhancements to the Los Angeles Eastside Light Rail Transit Project
Author | : Kendall B. Jue |
Publisher | : |
Total Pages | : |
Release | : 2003 |
ISBN-10 | : OCLC:52835392 |
ISBN-13 | : |
Rating | : 4/5 ( Downloads) |
Download or read book Modified Initial Study/addendum for the Proposed Project Enhancements to the Los Angeles Eastside Light Rail Transit Project written by Kendall B. Jue and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: MTA is preparing this Addendum to evaluate the environmental impacts associated with the proposed "Project Enhancements" to the previously adopted Los Angeles Eastside Corridor.