Trend Analysis Of Required Work Not Completed During Surface Ship Availabilities

Download Trend Analysis Of Required Work Not Completed During Surface Ship Availabilities full books in PDF, epub, and Kindle. Read online free Trend Analysis Of Required Work Not Completed During Surface Ship Availabilities ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads. We cannot guarantee that every ebooks is available!

Trend Analysis of Required Work Not Completed During Surface Ship Availabilities

Trend Analysis of Required Work Not Completed During Surface Ship Availabilities
Author :
Publisher :
Total Pages : 104
Release :
ISBN-10 : 1423544447
ISBN-13 : 9781423544449
Rating : 4/5 (449 Downloads)

Book Synopsis Trend Analysis of Required Work Not Completed During Surface Ship Availabilities by : Clifford A. Pish

Download or read book Trend Analysis of Required Work Not Completed During Surface Ship Availabilities written by Clifford A. Pish and published by . This book was released on 1999-06-01 with total page 104 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Ship Maintenance Program is designed to keep ships at the highest level of material condition practicable and to provide reasonable assurance that they will be available for operations to the fleet commanders. When the total cost of work required exceeds the level of funding for a maintenance availability, some of the work must be deferred. In this thesis the maintenance records available were examined to determine if trends exist in the type of work that is not being completed. Trends were established by comparing the required work items for ships prior to entering an availability to the records of jobs completed in the availability. Trends in certain categories, like engineering or habitability, may be factors that impact retention, environmental protection or other concerns facing the Navy. Further, the data for surface ship maintenance were assessed. This study found that data support the idea that a significant portion of work items pertaining to general categories of habitability (31 percent), weapons systems (23.1 percent) and electronics (18.1 percent) have been deferred for LPD availabilities between 1993 and 1998. The least deferred maintenance occurred in main propulsion (4.8 percent) and the electric plants (10.2 percent). This study was unable to identify any place where comprehensive historical data for surface ship maintenance availabilities are maintained.


Trend Analysis of Required Work Not Completed During Surface Ship Availabilities Related Books

Trend Analysis of Required Work Not Completed During Surface Ship Availabilities
Language: en
Pages: 104
Authors: Clifford A. Pish
Categories:
Type: BOOK - Published: 1999-06-01 - Publisher:

DOWNLOAD EBOOK

The Ship Maintenance Program is designed to keep ships at the highest level of material condition practicable and to provide reasonable assurance that they will
Assessment of Surface Ship Maintenance Requirements
Language: en
Pages: 0
Authors: Robert Button
Categories: Warships
Type: BOOK - Published: 2015 - Publisher: Rand Corporation

DOWNLOAD EBOOK

The Department of Defense is likely to face years of declining resources as the U.S. government grapples with fiscal challenges. These challenges affect every a
Impacts of the Fleet Response Plan on Surface Combatant Maintenance
Language: en
Pages: 72
Authors: Roland J. Yardley
Categories: Business & Economics
Type: BOOK - Published: 2006 - Publisher: Rand Corporation

DOWNLOAD EBOOK

To achieve a more responsive and more readily deployable fleet of surface combatants, the Navy adopted the Fleet Response Plan (FRP) in 2003 to replace its trad
Shipboard Electronics Material Officer
Language: en
Pages: 584
Authors: Harvey D. Vaughan
Categories: Ships
Type: BOOK - Published: 1992 - Publisher:

DOWNLOAD EBOOK

Surface Warfare
Language: en
Pages: 224
Authors:
Categories: Naval art and science
Type: BOOK - Published: 1983 - Publisher:

DOWNLOAD EBOOK